| Medium Landing Strip | |
|---|---|
![]() | |
| Author | Maxis |
| Size | 6x18 |
| Type | Transport |
| Plop cost | 5,700 |
| Monthly cost | 800 |
| Bulldoze cost | 1,400 |
| Construction time | 80 |
| Jobs | 65 R§ 45 R§§ 20 R§§§ |
| Flammability | 21 |
| Fire | 3 |
| Power | 4 |
| Water | 8 |
| Air pollution | 16 (radius 14) |
| Water pollution | 3 (radius 2) |
| Garbage | 3 (radius 0 |
